

found again
0 of 4
Inventory, documents and provenance, linked by surface fingerprinting.
Each registered artwork has a verified identity and an auditable record that counterparties can reference. Its identity is derived from its own surface, linking the digital record to the physical work.
Read once to register. Read again to verify.
Four surface points were registered on a single panel using an imaging device suited to its surface. Three were successfully verified within the following 70 seconds. The point names, scores and timestamps shown here come from that session.






The same research, paid for twice.
On a high-value work, research into provenance and condition is commissioned, paid for, and then rarely reusable: the same ground is covered again at the next sale, by the next party, at their expense. On lower-value works the documentation is skipped or lost, and by the time the work has matured those years cannot be recovered.
$59.6B
Global art market sales
Art Basel & UBS Global Art Market Report 2026 · for 202541.5M
Global art market transactions
Art Basel & UBS Global Art Market Report 2026 · for 2025$2.56T
Wealth held in art and collectibles
Deloitte Private & ArtTactic Art & Finance Report 2025 · for 2024What a permanent record is built on.
Trust deployed as a service, across three scopes: the object, the business around it, and the counterparties it passes through. The identity anchor is the surface of the work, which goes on changing.
The integrity and archive layers have been running in production for fifteen years.
The original evolves. A copy captures a moment in time.
A copy can reproduce the surface as it was registered, and there it stops. The original goes on changing, and each verification extends its record rather than replacing it.
Start now
Enterprise and Vault are the same system, entered at a different scale. Let’s start a conversation.
You are welcome to check for yourself.
Every registered work has a page anyone can open, without an account and without installing anything.
Adoration of the Magi
Panel, oil and gold · 38 × 27 cm
What has happened to this work
- Registered13 Oct 2026 · 4 surface points
- Condition report added18 Oct 2026 · uploaded by the holder
- Loaned for exhibition02 Nov 2026 · returned 04 Nov
- Verified on delivery04 Nov 2026 · read from a phone
The record itself
- Integrity stamp Carried
- Record written 13 Oct 2026
- Last verification 04 Nov 2026
- Changes detected since registration No
- Held in Switzerland
- Fingerprint a65f · 7c20 · 11e4
This page provides information about the registered object and the integrity of its record. It does not establish authenticity or authorship.
It begins with a conversation.
Book a free 15-minute conversation to discuss your documentation needs and explore whether SmartStamp is right for you. Where possible, we can demonstrate the technology using your own artworks.